Abstract
In this paper, we develop the control rules for job shop scheduling based on the Flow Rate Control model. We derive optimal control results for job shops with work station in series (transfer line). We use these results to derive rules which are suboptimal, robust against random events, and easy to implement and expand.
The PDF above is a preprint version of the article. The final version may be found at The Annals of Operations Research.
Full Citation
Annals of Operations Research
vol.
17
,
(January 01, 1989):
233
-248
.