Capacitated two-stage multi-item production/inventory model with joint setup costs
We analyze a continuous-time, two-stage production/inventory system. In the first stage, a common intermediate product is produced in batches, and possibly stored. In the second phase, the intermediate product is fabricated into n distinct finished products. Several finished products may be included in a single production batch of limited capacity to exploit economies of scale. We propose a planning methodology to address the combined problem of joint setup costs and capacity limits (per setup).